Ok, tell me if I have this right:
-insert EW-RS910 junction box into the back end of one extension
-connect 2x extension shifters to 1x EW-RS910 via JC-130 Y split cable
-connect JC-130, 2x basebar shifters and battery to 4-way JC41 or JC40 junction box in the stem cavity
I’m new to Di2, so please be gentle.
Scott
-insert EW-RS910 junction box into the back end of one extension
-connect 2x extension shifters to 1x EW-RS910 via JC-130 Y split cable
-connect JC-130, 2x basebar shifters and battery to 4-way JC41 or JC40 junction box in the stem cavity
I’m new to Di2, so please be gentle.
Scott
Last edited by:
GreatScott: Mar 10, 19 19:34