Bust out a concrete eraser, move the drain, pour back the slab.
If your slab is post tensioned, do not cut the tenon.
If your slab is post tensioned, do not cut the tenon.
Last edited by:
Bumble Bee: Feb 27, 18 15:46
Login required to started new threads
Login required to post replies
transition-DOT-area-AT-slowtwitch-DOT-com
©1999-2024 Slowtwitch, Inc., and Slowtwitch.com
Reproduction of material from any Slowtwitch.com page
without written permission is strictly prohibited.