Thanks in advance!
A grass roots tri I help organize has a 300 ft transition from the swim exit to transition. Is it necessary to cover the chip sealed concrete?
If so what is the lowest cost option that would be sufficient?
In my opinion if you do cover it I wouldn't roll out anything more than 3 or 4 ft wide.
Thoughts?
Thanks!
A grass roots tri I help organize has a 300 ft transition from the swim exit to transition. Is it necessary to cover the chip sealed concrete?
If so what is the lowest cost option that would be sufficient?
In my opinion if you do cover it I wouldn't roll out anything more than 3 or 4 ft wide.
Thoughts?
Thanks!