A Little hacking and some drilling on a 2005 P3Sl.
Got the frame for 350.00 and got the bars and TT shifters from the ST classifieds.
I had to drill through the top tube into the down tube to run a wire to junction B then to the RD.
Could not fit a battery in the seat post because of frame tube blocking so I put it in the right aero bar extension.
My climbing switch wire at the left brake lever was short to reach junction A in the 3T Integra stem so I added a spliced section to reach.[/img][/img][/img][/img]
Got the frame for 350.00 and got the bars and TT shifters from the ST classifieds.
I had to drill through the top tube into the down tube to run a wire to junction B then to the RD.
Could not fit a battery in the seat post because of frame tube blocking so I put it in the right aero bar extension.
My climbing switch wire at the left brake lever was short to reach junction A in the 3T Integra stem so I added a spliced section to reach.[/img][/img][/img][/img]
Last edited by:
Clutch Cargo: Jan 29, 17 6:50