My bathroom remodel is complete. Well, complete enough (Pics, lots of pics)

Not really. It took way too long and too much money. My master bath needs renovated as well. If I do that one any time soon, I’m going to hire someone to do rip out the tile and redo it all. I think I can handle cabinet installs and minor plumbing work under the sink. I don’t want to have anything to do with a tub and/or shower again though.

Your toilet seat is too high.

It’s a handicrapper. It should be too high.

I have a very similar project in my near future…thinking about going the contractor route now. We need to spray our tub, tile the floor and walls, new cabinets, new sink and new toilet.

I’m getting very tired of projects 2 years into my fixer house that I thought I’d have done in 6 months.

In that case, try have this project contracted out and see if the increased cost is worth it for you to not waste your weekends and weeknights doing it yourself.

My biggest problem is that ew only have one bathroom. If and when it gets done it will be in blitzkreig fashion.

A pro will be able to do a blitzkreig much faster than you can do a blitzkreig. You may also get used to showering at the gym, peeing off your balcony, and shitting in a bucket while you remodel your lone bathroom.

The plan is to ship the missus and kid off to the in-laws for a few days while I do the demo work and then probably have a contractor come in to do the remodel. I’m going to have all the materials and units lined up in the garage ready to go. No 25 trips to Home Depot on this job.

The nex “BIG” project is adding a second bathroom and laundry room, which I’m not looking forward to because it will turn my 37’ x 24 garage into a 24x24 garage and I’ll lose my workshop and bike storage. I spend a lot of time out there, especially when the in-laws are visiting…like this whole week. They’d look at me funny if I spent 6 hours of a Saturday afternoon puttering around in the master bath!

That’s a good plan. Actually, have the contractor do the demo work as well. They can do it a lot quicker than you can. Also, they tend to not do things like bust water lines like I did. However, the demo part is the most fun, though. I mean, how often can you take a sledgehammer to something? It’s a blast, but messy as well. It’s a good idea to have everything lined up in the garage. The lead time for my tiles was 24 hours, but the lead time for my cabinets was 6 months. Also, I had to special order my countertop. Once my cabinets were installed, they countertop guy had to come out, measure it, and then I had to wait 3 weeks for them to make it. In your situation, this won’t do unless you are able to reuse your existing countertop in the mean time. I used a Silestone countertop and I like it so far. It’s far cheaper than granite and you don’t have to treat it once a year like granite.

EDIT: Oh, it’ll be more than a few days. Expect a pro to take a week or so with all the thinset, grout, and paint that needs to dry. Also, how big is your bathroom? Mine is 5x7.

Very NICE Job:

I assume this was done during the off-season. I have remodeled a kitchen (The cost of buying my first Cervelo), and bathroom. And it is hard work!

I love the Playboy idea that is awesome.

But since this is Slowtwitch I should let you know that is ok to use spacers for tile.

Way to MAN up!

Pete