My bathroom remodel is complete. Well, complete enough (Pics, lots of pics)

I’ve posted previously about my bathroom remodel and I’ve had some problems like busting a water line and flooding my house for 45 minutes. Well, I’m done. OK, most of the way. I still need to do some minor caulking, putting up the crown molding, and a few other minor things, but right now, it is usable. First of all, here is a link to all the pictures.

Here is what I started out with at the beginning.
http://members.arstechnica.com/x/jastermereel/bathroom1.jpg
http://members.arstechnica.com/x/jastermereel/bathroom2.jpg

Cabinets ripped out and thrown into the backyard.
http://members.arstechnica.com/x/jastermereel/bathroom3.jpg

Bathroom after the cabinets were removed and completely soaked.
http://members.arstechnica.com/x/jastermereel/bathroom4.jpg

An example of the lovely linoleum that was done before.
http://members.arstechnica.com/x/jastermereel/bathroom5.jpg

The hole in the tile wall that started this whole affair.
http://members.arstechnica.com/x/jastermereel/bathroom6.jpg

Destruction!
http://members.arstechnica.com/x/jastermereel/bathroom7.jpg

Nastiness. This was dried out before I put stuff back up on the wall.
http://members.arstechnica.com/x/jastermereel/bathroom8.jpg

Popcorn ceiling after removal.
http://members.arstechnica.com/x/jastermereel/bathroom10.jpg

And the mess afterwards. That was fun!
http://members.arstechnica.com/x/jastermereel/bathroom11.jpg

The old faucet stuff.
http://members.arstechnica.com/x/jastermereel/bathroom12.jpg

Here is everything stripped down to the studs and cleaned up. I put in a nailer stud and that is the new looking stud in the corner. I put this one in to give the cement backer board something to give it support. I think the original hole was started because the plain drywall behind it couldn’t support it. I wanted to do this a lot better.
http://members.arstechnica.com/x/jastermereel/bathroom13.jpg

New faucet assembly.
http://members.arstechnica.com/x/jastermereel/bathroom14.jpg

This is the insulation installed as well. I put up some horizontal nailer boards as well. I really wish I had put these up near the top of the cement backer board as well. This really supported the backer board very well. I would recommend doing this to your bathroom because really helps out a lot!
http://members.arstechnica.com/x/jastermereel/bathroom15.jpg

This is the felt tar paper installed. Oh, make sure to give it some slack. The slack tar paper will be pushed into the wall. Otherwise, you’ll rip the corners like the picture below.
http://members.arstechnica.com/x/jastermereel/bathroom16.jpg
http://members.arstechnica.com/x/jastermereel/bathroom17.jpg

The cement backer board is going up now.
http://members.arstechnica.com/x/jastermereel/bathroom18.jpg

The seam on one wall. I think it was a pretty good match.
http://members.arstechnica.com/x/jastermereel/bathroom19.jpg

I even got the portions at the bottom of the wall next to the tub.
http://members.arstechnica.com/x/jastermereel/bathroom20.jpg

Cement backer board is done.
http://members.arstechnica.com/x/jastermereel/bathroom21.jpg

The Ars salute!
http://members.arstechnica.com/x/jastermereel/bathroom22.jpg

Here is the joint tape with a bit of mud on the seams.
http://members.arstechnica.com/x/jastermereel/bathroom24.jpg

Woot! The first tile!
http://members.arstechnica.com/x/jastermereel/bathroom25.jpg

I’ll skip forward a bit and here is the tile once it’s done. I ended up hating doing tile work so I paid someone else to finish it up for me. They did a crappy job, but at least it’s done now.
http://members.arstechnica.com/x/jastermereel/bathroom26.jpg

Grout is installed.
http://members.arstechnica.com/x/jastermereel/bathroom27.jpg

The 12" cabinet in the corner is actually a wall cabinet. I had to use some 2x4 pieces to basically install the base of this cabinet to get it in line with the main cabinet.
http://members.arstechnica.com/x/jastermereel/bathroom28.jpg

Oh, here is the surprise that I left for the person that remodels this bathroom in 20 years.
http://members.arstechnica.com/x/jastermereel/bathroom30.jpg
http://members.arstechnica.com/x/jastermereel/bathroom31.jpg
http://members.arstechnica.com/x/jastermereel/bathroom32.jpg

A pic where I’m putting the cabinets together.
http://members.arstechnica.com/x/jastermereel/bathroom33.jpg

The cabinets are installed. You can also see the hole cut into the main cabinet for the drain for the sink. I also had a water line on the left side of the main cabinet and there is another water line inside the cabinet.
http://members.arstechnica.com/x/jastermereel/bathroom34.jpg

This is just proof that I did change the color of the walls. This new color is called Kew Place by Ralph Lauren. I really like it. At first, I thought it was the exact same color as before, but it’s definitely not the pinkish beige that it was before.
http://members.arstechnica.com/x/jastermereel/bathroom35.jpg

Tile is done with the new paint as well.
http://members.arstechnica.com/x/jastermereel/bathroom36.jpg

Oh, here is a major screw up. When I reconnected the toilet supply line, I didn’t tighten it enough. It dripped and created a puddle. This got the brand new cabinets wet and the wood warped. I was fucking pissed. Man, this really sucks, but nothing I can do about it now.
http://members.arstechnica.com/x/jastermereel/bathroom37.jpg

Here’s the new faucet and the counter top.
http://members.arstechnica.com/x/jastermereel/bathroom38.jpg

Well, remember how I said that there is a water valve behind the cabinet? Well, this is how I worked around the issue. I cut a hole in the 12" cabinet. I then used a hinge and a latch to get easy access to it. After I flooded my house because I broke a water line, I put in brand new quarter turn ball valves to hopefully prevent that in the future.
http://members.arstechnica.com/x/jastermereel/bathroom39.jpg

Here is the plumbing work under the sink. I did most of it myself.
http://members.arstechnica.com/x/jastermereel/bathroom40.jpg

And here is the finished product with pics as good as I could get. The bathroom is small and it’s really hard to get all of it in one shot. I pretty much increased the cabinet space in this bathroom by 150% which is great. The wall cabinet is nice, but it blocks the light going into the shower. It shouldn’t be that bad, though. Also, the cabinet is out of the way so that you won’t hit your head when you getting up from the toilet.
http://members.arstechnica.com/x/jastermereel/bathroom41.jpg
http://members.arstechnica.com/x/jastermereel/bathroom42.jpg

Overall, I’m glad that it is done. I’ve enjoyed it and it’s frustrated the hell out of me, too. Next time though, the only thing that I want to do with the next remodel is to pick out the colors and write a check.

What do you guys think?

Nice work. Our bathroom in our 95 year-old house has similar dimensions and problems. I did some repair work around the tub a few years back and used blue board under the tile, I will definately go with cement board next time. By the way, is that Silestone Coffee quartz I see on the vanity? We used it for our kitchen re-model and love it.

Great job !!! I did the same type of job at my house last year.My house is 55 years old, pink tile in shower, floor, half way up the wall.The demo part was hell, they did SOLID construction back then. Looks like you are ready for a full kitchen remodel.

Yes, it is Silestone coffee quartz. Good call on that.

Yeah, no more remodeling for me. This was a pain in the ass and it took way too long, cost too much, and really tested my patience. I’m not interested in doing it again.

Eric,

You did a fine job. Congratulations.

Oh, here is a major screw up. When I reconnected the toilet supply line, I didn’t tighten it enough. It dripped and created a puddle. This got the brand new cabinets wet and the wood warped. I was fucking pissed. Man, this really sucks, but nothing I can do about it now.

You should find the positive in this. Now there is an assurance that at some point someone will find your “time capsule.”

Bernie

Nice job, Eric. Your play-by-play shows just how hard it is to do this stuff. I don’t think carpenters, plumbers, electricians, etc. get enough respect for the work they do (especially the good ones). We gutted our house a few years ago and added an addition. We didn’t do the work ourselves, but even so it was stressful just overseeing the project. I can’t imagine doing the work too. Congrats and enjoy.

would have been much easier to just move.

pretty cool pictorial on the project!

Did a similiar project a while back, but also pulled out the tub, and replaced with a 350lb cast iron job.

Tile job on walls is terrible, We went with swanstone solid surface panels, delivered to the house, cut out holes for plumping and glue them up. Very easy and look nice, plus no grout lines to clean or seal.

Pic from their website; lots of colors available. Though that is close to what ours looks like.

http://www.theswancorp.com/products/tubWalls/images/SS72-3.jpg

But anyhow job well done.

Is that your answer to everything? Oh, I need to remodel the bathroom. I’ll move instead. Oh, there’s a snake in the house. I’ll move instead. Oh, the garbage needs to be taken out to the curb. I’ll move instead. :wink:

snake = definate moving. remolded = probably not buying the house in the first place. I looked at over 200 houses before buying the one I’m in. Just about everyone did a bad remodel job here or there or something else was wrong like the roof was caving in etc.
taking out the trash - thats what I have a wife for :wink:

Nice job! The time capsule cracks me up.

Your post has sealed the deal on my hiring out my bathroom remodel.

I would also recommend hiring out your bathroom. Unless you are extremely handy, have lots of experience remodeling, or just love doing this stuff, hire it out. Now, that gets into another mess. I would highly recommend hiring somebody where you can actually go physically see some of their previous work. You can’t really get much attention for detail from pictures and/or websites. People will have references so call those references and ask to go see their homes. You may get a bunch of “Hell, no!” answers, but you may get a few positive answers. My tile guy had good references, but I still think they did a crappy job. The tile looks great from afar, but once you get your nose about a foot from the tile, you can start seeing issues with it.

Nice work, at least you are finished. I am doing a home improvement project right now, and I echo your “this sucks” mantra. Time capsule is awesome.

Nice job…love the time capsule.

I feel your pain with the water damage on the bottom of the cabinet. Have you considered concealing it with a piece of molding finished to match?

taking out the trash - thats what I have a wife for :wink:


Ha! Mine does that too!

I usually store my level with the other tools, but if you think on top of the bathroom cabinet is the place for it, go to town.

For the damaged cabinet, think about taking some spare moulding you used on the wall, throw a coping joint on it, stain it to match the cabinet, and nail it on. Just a thought shooting from the hip. Also, did you sink the moulding nails and fill 'em in then paint? It looks like I can see a bunch of nail heads in the moulding.

Hey, the level is there to make sure that that cabinet stays level all the time. I’m not storing it there. That’s stupid. I have a valid reason for it being there. Yeah, that’s it.

I did countersink the nail heads into the molding, but I haven’t had a chance to fill them up yet. Oh, that’s something that I forgot to mention. I used vinyl molding instead of wood molding. It’s much easier to work with and I don’t have to worry about splinters, splitting, or rotting. I’m very happy with it. I’ll eventually get around to filling in the holes and doing some touchup paint, but it’ll probably be awhile.

I have thought about a few different solutions but none of them are great. One solution is just to leave it like it is. It’s really not noticeable unless someone points it out because it isn’t in a highly visible spot. I could take the baseboard molding on that side of the cabinet to cover it up. I also have some trim that I used to cover up the toe space under the front of the cabinets. I could use a piece of that and put it on the side, but it would look weird. Right now, I’m leaning towards just leaving it.

Maybe take a piece of the toe kick trim and route the profile of the baseboard molding? A pain either way. Nice job on the remodel though. I guessing you’re not looking to jump right in and do another one of those anytime soon!