Not sure I follow what others are saying about the massive price increase.
Last year's CF SLX UltegraDi2 is $7500 and the new one is $8000 and comes with a power meter. Basically $0 increase subtracting the cost of the PM.
Last year's CF SLX Dura-Ace Di2 is $10500 (on sale now for 9K) and this years (called the CFR) is $12k with a power meter so not a big increase (maybe 500-1000 after cost of PM?).
And for the entry level version (non-SLX) they seem to have increased $500.
Cheers, Ray
Last year's CF SLX UltegraDi2 is $7500 and the new one is $8000 and comes with a power meter. Basically $0 increase subtracting the cost of the PM.
Last year's CF SLX Dura-Ace Di2 is $10500 (on sale now for 9K) and this years (called the CFR) is $12k with a power meter so not a big increase (maybe 500-1000 after cost of PM?).
And for the entry level version (non-SLX) they seem to have increased $500.
Cheers, Ray